Examples of Installation of Expansion Devices | Keiji Bypass / Keihan Overpass [Crittec Industries]
Continuous adoption on Meishin Expressway and Keiji Bypass. A large expansion joint with a proven durability of 100 years【Hybrid Joint Type 3LII】.
We would like to introduce a case study of the hybrid joint (3LII type) for bridge expansion devices, which excels in water resistance and durability. 【Case Study 1】 - Location: Kyoto Prefecture (Keiji Bypass, Keihan Overpass) - Client: Kyoto Expressway Office - Project Name: FY 2023 Replacement Work for Expansion Devices within the Jurisdiction of Kyoto Expressway Office - Construction Period: September 2024 - Product: Hybrid Joint 3LII-350 【Case Study 2】 - Location: Kyoto Prefecture (Keiji Bypass, Keihan Overpass) - Client: Kyoto Expressway Office - Project Name: FY 2023 Replacement Work for Expansion Devices within the Jurisdiction of Kyoto Expressway Office - Construction Period: November 2025 - Products: Hybrid Joint 3LII-150, 3LII-160 - Comment: The high evaluation of the construction results in 2024 led to continued adoption for the following year's project. The replacement with product joints has achieved water resistance, durability, and low noise. The standard specifications of non-drainage structure and secondary water stop materials have significantly reduced the risk of leakage under the girders. For more details, please contact us or request a catalog.
- Company:クリテック工業 本社、大阪営業所
- Price:Other